St. Stephen’s College Alteration and Addition Work

Alteration and addition works at St. Stephen’s College (Stanley) – the purpose of this extension work on the roof floor is for building extra classrooms. Demolition including slabs, columns, beams, walls and existing staircase (Approx. 95m²). The whole demolition
work make use of combinations of techniques such as: coring, blade saw cut, wire cut, robot breaking and hydraulic bursting method.

Before

Scissor working platform to erect the I-beam lifting gantry

Fixing single props below the cantilever beam

Saw cut the cantilever beam holding by mobile crane

Lifting cut pieces by mobile crane

Saw cut the cantilever beam holding by lifting gantry

Break the roof slab by remote control operated robotic breaker

Demolish the staircase by remote control operated robotic breaker

Demolish the roof R.C. structure

After

Back
 

Tsim Sha Tsui MTR Station Demolition Work



Shatin Tai Wai New Town Stage 1 Phase 1 Bridge No.2 Demolition Work



Taikoo Place Linkage Demolition and Alteration Work


Copyright © Drillcut Ltd. All right reserved. Powered by Stoneast