Our Service Shatin Tai Wai New Town Stage 1 Phase 1 Bridge No.2 Demolition Work
As required by main contactor, we demolished the R.C. bridge deck of 200m (Length) × 12m (Width) with the low-noise demolition methods. According to the actual site condition, we ahead schedule by using the coring, wire cut, blade saw cut and road saw to cut the segment into small parts and then remove off site.